News - August 2010

Preparing procedures qualifications project IHC fabrication.
De Klerk Werkendam, 
www.deklerkbv.nl
  
  
  The De Klerk company managed to acquire a part of a 
  large 
IHC contract. The assignment consists of the 
assembly and welding of plate fields Grade EH-36  
 material by means of flux-cored arc welding FCAW(M)
      Above: Test part welded with a combination of FCAW & SAW
 and submerged arc welding (SAW). Before starting this
    Below: Some prefab parts after assembly and welding.
  project under DetNorske Veritas a large
 number of 
 qualifications needed to be welded according to the


 DNV OS-C401 specification. I was assigned by De Klerk
 to carry out the entire assistance of the process 
 and after positive results a start with the welding 
 activities 
 was made immediately.