News - November 2010

Project management / QC activities during the manufacturing of a number of "winches".
Bos Wieldrecht, Dordrecht (NL),
www.boswieldrecht.nl
In the recent months, two winches where fabricated at Bos
Wieldrecht in Dordrecht. This project was ordered by the firm
Above: Winch with winchdrum from design to reality
Bezemer B.V. which is also established in Dordrecht. The
Below: Lineare winch, from design to reality
manufacture of winches is carried out according to the DNV rules


OS C-401. LAB Verduyn B.V. is assigned to setup the required
welding plan, the quality control, and the preparation of the
final databooks.